Sunday, February 11, 2007

Gate and Driveway update

This past Wednesday the dirt for the driveway went down. The skid loader got stuck multiple times...once for about an hour. The dirt arrived 7 hours late and all at once. The loader developed a hydraulic leak and had to be swapped out. Because of the late arrival of the dirt and the leak, the rental company allowed me to keep the loader for another few hours on Thursday to finish up. However, on Thursday it began to rain around 8am and did not stop until around 9am. At this point it was too wet to continue using the loader to spread & smooth the dirt. Below are the pictures of the driveway, doors and gate. The doors currently have OSB on one side. Once construction is over, it will be replaced with multi-wall polycarbonate and stainless on both sides.

















0 Comments:

Post a Comment

<< Home